Lot Cost Process –In case if the Ingredient, Product, By-Product Costing is defined
as Lot Enabled Item then you have to run this concurrent to get the lot cost.
Production Lot Cost Output:Lot Cost Calculation as Follows:
Product: 552812FOHLAA55 / Lot: HSR_FG00000055 - 3.526000000
Breakup:
Raw Material - 3.126000000
Resource - 0.400000000
Raw Material Calculation:
Item | Actual Qty | Unit Price | Value |
22CONSDGOHYA | 1.20000 | 1 | 1.2 |
21PLNBWB0400 | .92400 | 2 | 1.848 |
20DIRRTTG006 | .02600 | 3 | 0.078 |
Sum | 3.126 |
Resource Cost Calculation:
System Setup
Operation | Activity | Resource | Process Qty | UOM | Usage | UOM |
Stone Bagging | 999 | 3000 | . 00000 | GMS | .00000 | HR |
Kanban Bagging | 999 | 3000 | .00000 | GMS | .00000 | HR |
Rack Deallocation | 999 | 3000 | .00000 | GMS | .00000 | HR |
Downstream Stud | 999 | 3000 | 10 | GMS | 1 | HR |
System Usage:
Resource Cost = Actual Usage * Resource Cost = 0.4*1 =0.4
Operation | Activity | Resource | Actual Process Qty | UOM | Actual Usage | UOM |
Downstream Stud | 999 | 3000 | 4 | GMS | .4000 | HR |
That is 1 HR is used to prepare 10 GMS. Then to prepare 4 GMS how much HRS
Actual Cost Process- In case if the Ingredient, Product, By-Product Costing is defined as Actual Cost. Run this concurrent to get the costing.

Standard Cost Roll up - Run the Standard Cost Roll up if you want the cost to be calculated for the batch transactions.
Before you run this concurrent define the standard cost in Item Cost Window for a particular period.